Projects

Futuro Elevado

Proposed Overpass

Recently we participated in a geotechnical investigation for a proposed overpass on one of the busiest highways in Dominican Republic. Due to traffic and despite the existing conditions, we considered...

Proposed Overpass

Recently we participated in a geotechnical investigation for a proposed overpass on one of the busiest highways in Dominican Republic. Due to traffic and despite the existing conditions, we considered...

Minera de Calizas

Limestone Exploration

We wrapped up 2025 by performing a Limestone exploration for a future aggregate plant in Dominican Republic. The HQ drillings were 10 m deep in order to verify limestone thickness...

Limestone Exploration

We wrapped up 2025 by performing a Limestone exploration for a future aggregate plant in Dominican Republic. The HQ drillings were 10 m deep in order to verify limestone thickness...

Torre Frente al Mar

Ocean Front High-Rise

Recently we were involved in the investigation of a project located on the north end of the Dominican Republic for a 20-story ocean front high-rise. The recovered soils consisted of...

Ocean Front High-Rise

Recently we were involved in the investigation of a project located on the north end of the Dominican Republic for a 20-story ocean front high-rise. The recovered soils consisted of...

Futura Torre de 30 Niveles

Proposed 30-Story High-Rise

Geotechnical investigation for a proposed 30-story high-rise with 4 parking levels below ground in the city of Santo Domingo. The geotechnical campaign included borings up to 50 m deep.

Proposed 30-Story High-Rise

Geotechnical investigation for a proposed 30-story high-rise with 4 parking levels below ground in the city of Santo Domingo. The geotechnical campaign included borings up to 50 m deep.

Puente Propuesto

Proposed Bridge

Geotechnical exploration for a proposed bridge in the Dominican Republic. The exploration included 20 m deep HQ borings.

Proposed Bridge

Geotechnical exploration for a proposed bridge in the Dominican Republic. The exploration included 20 m deep HQ borings.

Subestación Eléctrica

Electrical Substation

Recently we were involved in a geotechnical investigation for a proposed electrical substation located southwest of the Dominican Republic. Our crew performed 15 m deep HQ borings in alluvial soils....

Electrical Substation

Recently we were involved in a geotechnical investigation for a proposed electrical substation located southwest of the Dominican Republic. Our crew performed 15 m deep HQ borings in alluvial soils....