Projects

Torre de 30 Niveles y 5 Sótanos

30-Story High Rise with 5 Underground Levels

A few weeks ago we performed the geotechnical investigation for a 30-story high rise with 5 underground levels in the city of Santo Domingo. The SOW included borings between 50...

30-Story High Rise with 5 Underground Levels

A few weeks ago we performed the geotechnical investigation for a 30-story high rise with 5 underground levels in the city of Santo Domingo. The SOW included borings between 50...

Parque Solar al Jamaica

Solar Farm in Jamaica

Recently we were involved with a geotechnnical exploration for a solar farm located west of Jamaica. The solar farm suffered damages due to Hurricane Melissa in 2025. The exploration included...

Solar Farm in Jamaica

Recently we were involved with a geotechnnical exploration for a solar farm located west of Jamaica. The solar farm suffered damages due to Hurricane Melissa in 2025. The exploration included...

Perforaciones de Hasta 55 m de Profundidad

Borings up to 55 m Deep

Geotechnical investigation for a proposed 28-story high-rise with 4 parking levels below ground in the city of Santo Domingo. The geotechnical campaign included borings up to 55 m deep.

Borings up to 55 m Deep

Geotechnical investigation for a proposed 28-story high-rise with 4 parking levels below ground in the city of Santo Domingo. The geotechnical campaign included borings up to 55 m deep.

Puente que Será Reconstruído

Proposed Bridge Replacement

Geotechnical exploration for a proposed bridge replacement. Borings were performed up to 50 m deep. Subsoils consisted of very soft clays, mostly. The geotechnical investigation is paramount for the execution...

Proposed Bridge Replacement

Geotechnical exploration for a proposed bridge replacement. Borings were performed up to 50 m deep. Subsoils consisted of very soft clays, mostly. The geotechnical investigation is paramount for the execution...

Futuro Elevado

Proposed Overpass

Recently we participated in a geotechnical investigation for a proposed overpass on one of the busiest highways in Dominican Republic. Due to traffic and despite the existing conditions, we considered...

Proposed Overpass

Recently we participated in a geotechnical investigation for a proposed overpass on one of the busiest highways in Dominican Republic. Due to traffic and despite the existing conditions, we considered...

Minera de Calizas

Limestone Exploration

We wrapped up 2025 by performing a Limestone exploration for a future aggregate plant in Dominican Republic. The HQ drillings were 10 m deep in order to verify limestone thickness...

Limestone Exploration

We wrapped up 2025 by performing a Limestone exploration for a future aggregate plant in Dominican Republic. The HQ drillings were 10 m deep in order to verify limestone thickness...