Projects

Arcillas de blandas

Soft Clays

Recently we worked on the geotechnical exploration for a proposed 20 story high-rise. Borings detected very soft to soft clays in the top 10 m. It is mandatory to know...

Soft Clays

Recently we worked on the geotechnical exploration for a proposed 20 story high-rise. Borings detected very soft to soft clays in the top 10 m. It is mandatory to know...

Torre de 30 Niveles y 5 Sótanos

30-Story High Rise with 5 Underground Levels

A few weeks ago we performed the geotechnical investigation for a 30-story high rise with 5 underground levels in the city of Santo Domingo. The SOW included borings between 50...

30-Story High Rise with 5 Underground Levels

A few weeks ago we performed the geotechnical investigation for a 30-story high rise with 5 underground levels in the city of Santo Domingo. The SOW included borings between 50...

Parque Solar al Jamaica

Solar Farm in Jamaica

Recently we were involved with a geotechnnical exploration for a solar farm located west of Jamaica. The solar farm suffered damages due to Hurricane Melissa in 2025. The exploration included...

Solar Farm in Jamaica

Recently we were involved with a geotechnnical exploration for a solar farm located west of Jamaica. The solar farm suffered damages due to Hurricane Melissa in 2025. The exploration included...

Perforaciones de Hasta 55 m de Profundidad

Borings up to 55 m Deep

Geotechnical investigation for a proposed 28-story high-rise with 4 parking levels below ground in the city of Santo Domingo. The geotechnical campaign included borings up to 55 m deep.

Borings up to 55 m Deep

Geotechnical investigation for a proposed 28-story high-rise with 4 parking levels below ground in the city of Santo Domingo. The geotechnical campaign included borings up to 55 m deep.

Puente que Será Reconstruído

Proposed Bridge Replacement

Geotechnical exploration for a proposed bridge replacement. Borings were performed up to 50 m deep. Subsoils consisted of very soft clays, mostly. The geotechnical investigation is paramount for the execution...

Proposed Bridge Replacement

Geotechnical exploration for a proposed bridge replacement. Borings were performed up to 50 m deep. Subsoils consisted of very soft clays, mostly. The geotechnical investigation is paramount for the execution...

Futuro Elevado

Proposed Overpass

Recently we participated in a geotechnical investigation for a proposed overpass on one of the busiest highways in Dominican Republic. Due to traffic and despite the existing conditions, we considered...

Proposed Overpass

Recently we participated in a geotechnical investigation for a proposed overpass on one of the busiest highways in Dominican Republic. Due to traffic and despite the existing conditions, we considered...